UCL-University College London
University College London is one of the world’s leading multi-disciplinary universities, its currently ranked the seventh in the world.
UCL, in partnership with Qatar Foundation created UCL Qatar, a leading center of excellence for higher education studies.
Project Details
Project Title:
University College London
Client:
Qatar Foundation
Project Location:
Doha – Qatar
Consultant:
Hyder Consulting
Project Type:
Research Laboratories
Project Date:
2013
Our Scope
Design, Supply, Testing, Commissioning and Integration of the Laboratory Dilution & Exhaust System
The High plume fans system is designed to have high discharge velocities and dilution by inducing fresh air through a stack. A combination of Air volume and velocity contributes to a high plume exhaust while diluting hazardous exhaust concentrations. MK Plastics Axijet fans series is a great fit this purpose.
MK Plastics Axijet Design Features
AMCA certified for both Air & Sound
High efficiency.
Low radiated sound levels.
Greater airflow and high-pressure capabilities, with stable operation throughout the operating curve.
The Motor and drive components are placed outside the contaminated airstream (easy to maintain)
4 Fans Sets, each of a Duty/Standby arrangement were installed to extract the hazardous air from the building. Different sizes of fans sets were installed, to serve the various needs of the building sections.
A PLC based, Factory programmed & tested Lead-Lag Control Panel is used to control the operation of each fan set. The control system monitors &controls the fans speed, duty cycling, alarms, flow measurements & dampers operation to achieve the required operating conditions. All the system parameters are integrated to the Building Management System via BACnet/IP.
As a part of the complete solution, Climasys also supplied tested & commissioned all the MCC panels equipped with VFDs including the integration between the VFDs & the PLC via Profibus.